June 11, 2015

MetriLOCK installation on board an AirBP fuel truck

The installation of another MetriLOCK System on board an AirBP aircraft refueling truck was successfully completed by Metricon technicians at the airport of Heraklion, Crete.

ML_AIRBP_01ML_AIRBP_04ML_AIRBP_03ML_AIRBP_07

ML_AIRBP_05ML_AIRBP_06 ML_AIRBP_08ML_AIRBP_09

 

metricon

About metricon

  •  

Leave a Reply